SMOKE ALERT SYSTEM FOR INDUSTRIES

Product Code: Embedded Systems Projects
Availability: In Stock
Price: Request for Price
Qty:  
   - OR -   

 

SMOKE ALERT SYSTEM FOR INDUSTRIES

 

This   project is developed for the users to avoid smoking in industries.  It consists of a Smoke sensor connected to the microcontroller unit. 

 

If anyone smokes, the smoke sensor immediately senses the occurrence of smoke.  It sends signal to the microcontroller through driver unit.  The microcontroller analyses the signal and operates the siren unit.  If a camera is connected, it captures the person who smokes at the time.

 

This setup can be used in Industries, Schools and Colleges to avoid smoking. 

 

The microcontroller program is written in assembly language.  The microcontroller used is PIC 16F73.

 

 

Write a review

Your Name:


Your Review: Note: HTML is not translated!

Rating: Bad           Good

Enter the code in the box below:



Tags:
© Copyright All Rights Reserved 2013 | DELIBERS